Project Purpose:The total scale of the project is 1,000 tons of municipal solid waste per day and 365,000 tons per year.
The first phase of the project is equipped with a 500t/d waste incineration production line + a 9MW condensed-steam turbine generator set. The boiler uses grate furnace + waste heat boiler, and its designed fuel is domestic waste.
|